Skip to content
Present on the A1 since 1987
About us Products Supply projects Quality and Environment Sustainability
Our story Innovation
Guia de Aplicações Comparar Produtos Biblioteca Técnica Catálogo PDF Glossário Pesquisar
Trabalhe Connosco Contact
PT EN ES FR
+351 236 200 110

supply projects_

In its more than 50 years of activity, Iberobrita has supplied and continues to supply some of the country's most emblematic projects.

References that prove Iberobrita's quality and responsiveness on site.

Parceiros no Crescimento de Portugal

A Iberobrita trabalha lado a lado com construtoras, municípios e entidades do Estado para garantir que cada obra tem os materiais certos, na quantidade certa e no momento certo.

Construtoras Municípios Estado
Logistics and capacity

Industrial capacity to support your project from start to finish.

Four active quarries based in Pombal, with our own transport coordinated with logistics partners. Effective coverage from northern to central Portugal and western Spain.

Annual capacity
1M+
Tonnes/year of CE-certified limestone aggregates.
Effective radius
250km
From Pombal: northern, central and Greater Lisbon covered.
Active sites
4
Quarries in continuous operation with dedicated crushing and sieving.
Lead-time
24–72h
From quote confirmation to first delivery on site, depending on destination.
Área de fornecimento

Cobertura efetiva do centro ao norte de Portugal

A partir da Pedreira Barrocal em Pombal, a Iberobrita cobre um raio efetivo de 250 km com frota própria e parceiros logísticos. O prazo de entrega varia entre 24 e 72 horas após confirmação de encomenda.

Grande Lisboa
Lisboa · Setúbal
Lead-time: 48–72h
Centro
Leiria · Coimbra · Santarém
Lead-time: 24–48h
Centro Interior
Viseu · Castelo Branco · Guarda
Lead-time: 48–72h
Norte
Porto · Aveiro · Braga
Lead-time: 48–72h
Alentejo
Évora · Portalegre
Lead-time: 48–72h
Espanha (Oeste)
Salamanca · Cáceres
Lead-time: 72h+

* Prazos indicativos. Entregas urgentes e fornecimentos fora da área indicada sujeitos a consulta.

A1 Motorway
Infraestruturas de Portugal

A1 Motorway

Lisbon–Porto section. Continuous supply of aggregates for paving and sub-base over more than 300 km of motorway.

500.000 tVolume supplied
Crushed stone · Tout-venantMaterials
A6 / A13 Motorway
Ascendi

A6 / A13 Motorway

Centre–south link. Aggregates for sub-base and base layers in regional motorways.

250.000 tVolume supplied
Sub-base · Tout-venantMaterials
Lisbon Metro
Lisbon Metro

Lisbon Metro

Metro network extension. Supply of aggregates for structural concrete and foundation layers in tunnels and stations.

180.000 tVolume supplied
Crushed stone · Limestone sandMaterials
Sines Container Terminal
APS — Port of Sines

Sines Container Terminal

Supply of rock-fill and embankment material for the expansion of the container terminal at the Port of Sines.

350.000 tVolume supplied
Rock-fill · Tout-venantMaterials
IC2 — Cantanhede Bypass
Cantanhede Municipality

IC2 — Cantanhede Bypass

National road network. Aggregates for paving and earthworks on the IC2 bypass in Cantanhede.

120.000 tVolume supplied
Crushed stone · Tout-venantMaterials
North Line — Modernisation
IP Engenharia

North Line — Modernisation

Rail infrastructure modernisation. Supply of ballast and crushed stone for track renewal between Lisbon and Porto.

200.000 tVolume supplied
Ballast · Crushed stoneMaterials
Project history

More than 50 years alongside the country's main infrastructure.

A selection of the public and private projects where Iberobrita aggregates have been present — motorways, railways, cultural facilities and ports.

A1
Northern Motorway
Albergaria · Estarreja · Feira sections
A8
Atlantic Motorway
Lisbon — Leiria, western sections
A14
A14 — Coimbra North
Santa Eulália / Coimbra Norte sub-section
A17
A17 — Central Coast
Mira — Aveiro
A23
A23 / IP2
Castelo Branco
IC8
IC8 — Complementary Itinerary
Pombal — Ansião section
IP5
IP5 — Costa de Prata Scut
Main coastal itinerary
EN17
EN17 — Upgrade
Coimbra — Vila Nova de Poiares
FACILITY
Casa da Música
Porto — aggregates for structural concrete
A25 INTERCHANGE
Aveiro Stadium Interchange
Municipal Stadium accesses
How we work

From first contact to on-site delivery — a simple, direct process.

01

Initial contact

Call us or send an email describing your need: type of project, desired product and estimated volumes.

02

Technical analysis

Our team reviews the requirements and proposes the most suitable aggregate, referencing the applicable EN standards.

03

Proposal and planning

We present a commercial proposal with prices, deadlines and delivery logistics. We plan production according to the project schedule.

04

On-site delivery

Supply with our own fleet or logistics partners. Scheduled deliveries with delivery note and certificate of conformity.

Conhecimento do Setor

Inovação e Tendências na Indústria de Agregados

Innovation

Inovação na extração sustentável

Novas técnicas de extração reduzem o impacto ambiental e aumentam a eficiência na produção de agregados de qualidade.

Setor

A importância dos inertes na vida moderna

Dos pavimentos às fundações, os inertes estão presentes em cada estrutura que sustenta o nosso quotidiano.

Tecnologia

Como a tecnologia está a mudar o setor

A automação e a monitorização digital estão a transformar a forma como as pedreiras operam e entregam.

Tendências

Projetos e tendências na construção civil

O setor da construção civil evolui rapidamente — descubra as principais tendências que estão a moldar o futuro.